SAP ADM100

1) What is SAP Instance? (Single Choice)
a. Group of Database that make a system runnable
b. Group of SAP instances that make a system runnable
c. Group of Services that make a system runnable
d. Group of O/S level Files that make a system runnable
2) What is the name of the DEFAULT Profile in SAP System? (Single Choice)
a. DEFAULT.imp
b. DEFAULT.prof
c. DEFAULT.pfl
d. DEFAULT.ini
3) Spool Request is created by which Work Process? (Single Choice)
a. Spool Work Process
b. Dispatcher
c. Message Server
d. Dialog Work Process
4) What is the Profile Parameter name used to set the Trace Level in SAP system? (Single Choice)
a. rdisp/trace_level
b. rdisp/tracelevel
c. rdisp/LEVEL
d. rdisp/TRACE
5) The Standard SAP User SAP* has the following password (Single Choice)
a. 06071992
b. 19920706
c. 07061992
d. 19920607
6) What is the order in which the Profile files are read during the system start? (Single Choice)
a. DEFAULT, INSTANCE & START
b. INSTANCE, DEFAULT & START
c. START, INSTANCE, DEFAULT
d. START, DEFAULT, INSTANCE
7) Transaction Code used for Profile Maintenance / Job overview is: (Single Choice)
a. PFCG / SM37
b. RZ11 / SM36
c. RZ10 / SM37
d. RZ03 / SM37
8) What will happen if a background job is running and the Operation Mode Switch is activated in between? (Single Choice)
a. The job will be cancelled
b. The job will be put in Suspended state
c. The Job will continue to run and once it finishes then the Operation Mode Switch will occur
d. The Operation Mode will happen the next day
9) State whether the followings statements are True or False:
a. W Gate should always be on Web Server
b. A Gate should always be coupled with W Gate
c. SAP System should be installed on NT Operating System
d. Dual Host Installation in ITS means A Gate and W Gate are on the same host
10) From SAP System which process is used to start External Command / Program (Single Choice)
a. sapxpg
b. sapevt
c. disp+work.exe
d. gwrd
11) ‘Event-Based Job Scheduler’ runs on every instance (True / False)
12) Printer Name in SAP is not case sensitive (True / False)
13) SAP System has a Operation Mode configured. There are performance issues in the System and finally the BASIS administrator adds RAM (Physical Memory) to the Server. He configures few parameters and increases the no. of work processes. The BASIS administrator needs to redefine Operation Mode to take effect of the new processes –(True/False)
14) The standard System Landscape recommended by SAP is: (Single Choice)
a. DEV, QAS & PRD systems on one Server
b. DEV & QAS on one server and PRD on another server
c. DEV, QAS & PRD on separate server
d. DEV on one server and QAS & PRD on one server
15) Access Method is: (Single Choice)
a. Connection between Dialog & Spool Work Process
b. Connection between OS Spool and the Actual Printer
c. Connection between Spool Work Process and OS Spool
d. Connection between Spool Request & Output Request
16) Locking Process of SAP Transactions is carried out by: (Single Choice)
a. Enqueue
b. Dialog
c. Spool
d. Background
17) Spool Data is stored in which table: (Single Choice)
a. TSP01
b. TSP03
c. TST03
d. TSP02
18) From External Program which process is used to trigger an event in SAP System? (Single Choice)
a. sapxpg
b. sapevt
c. disp+work.exe
d. icmon
19) In 3 system landscape from where the request can be imported in QAS system (Single Choice)
a. Only from DEV
b. Only from QAS
c. Only from PRD
d. From all three systems
20) State whether the following statements are True/False in case of Note Assistant: (Multiple Choice)
a. No SPDD modification adjustment required during upgrade / when importing Support Packages
b. SSCR request is required
c. Changes are noted in Modification Assistant (SE95)
d. Changes are done through SNOTES transaction
21) While importing Support Packages you need to do the following. State True/False:
a. Update SPAM/SAINT update with latest version
b. Client 000 is not to be used for importing
c. Import must always be performed during peak operations
d. Aborted packages must be kept untouched
22) Uses of Solution Manager (Multiple Choice)
a. Operations Portal
b. Solution Monitoring
c. Support Portal
d. Transaction Creation Portal
23) CCMS Monitoring Infrastructure consists of: (Single Choice)
a. Data Migration
b. Data Collection
c. Data Storage
d. Data Archiving
24) The following are the components of a DB: (Multiple Choice)
a. Database Buffer
b. Data Files
c. SAP Kernel
d. Special DB Processes
25) ICM (Internet Communication Manager) is a Process (True/False)

SAP TADM12

1) Which of the following components indicate that R3 is a client / server system?
Multiple DB’s
Database server
3 separate hardware servers (DB, applcn & presentation server)
Db service, app service & presentation service

2) Which of the following is not contained in R/3 DB?
a. The R/3 Repository
b. The R/3 kernel
c. Customer Data
d. Transaction data
e. Customizing Data
f. The ABAP dictionary

3) Which of the following is correct in regard to R/3 clients?9/15/2003
a. The R/3 client has it’s own customer data and programs which are not accessible to other clients within the same R/3 system.
b. An R/3 client has all R/3 repository objects and client independent customizing with all other clients in the R/3 system
c. An R/3 client shares customizing and Applcn data with other clients in the same R/3 system
d. An R/3 client enables you to separate applcn data from customizing data

4) Which of the following statements is correct in regard to SAP Client Concept
a. All customizing settings are client independent
b. A client has unique set of applcn data
c. A client has it’s own repository objects
d. All customizing settings are client dependant

5) Which of the following strategies enables R/3 customers to avoid making modifications to SAP Std objects?
a. Using Enhancement techs such as Program exits & menu exits
b. Modifying SAP delivered programs
c. Changing SAP std functionality using the IMG
d. Performing customizing to provide the required functionality

6) Which of the following statements are correct in regard to IMG?
a. The IMG consists of series of customizing activities for defining a Companies Business process
b. The IMG is a online resource providing the necessary info and steps to help you implementing the R/3 applcn Modules
c. IMG is client independent
d. All of the above

7) Which of the following strategies enables an Enterprise to meet its business needs by changing or enhancing R/3 functionality
a. Maintaining application data using the Various R3 Business transactions in the SAP Std
b. Using the ABAP workbench to create the read R/3 repository objects
c. Using customizing to modify R/3 programs after obtaining an access key from OSS
d. Using customer Exits to enhance the functionality of existing SAP Objects

8) Which of the following statements are correct in regards to modifications
A a modification is a change to an SAP Std object
b. A modification must be registered using the SAP OSS (SSCR)
c. SAP recommends modification only if customer’s business meets cannot be me by customizing enhancement techs or customer dev
d. All the above

9) Which of the following statements is correct in regard to the customizing
a. Customizing enables R/3 applcn process to be set to reflect a companies business needs
b. Customizing can be performed only from within IMG
c. Customizing is necessary because R/3 delivered w/o Business process.
d. None of the above

10) Which of the following is correct in regard to R/3 repository
a. Customers can develop new repository objects using tools in the ABAP workbench.
b. Customer developed repository objects reside in the R/3 repository alongside std repository objects
c. Customers can create & assign new repository objects to a development class
d. All of the above


11) Which of the following statements is correct in regard to critical client roles as recommended by SAP?
a. Customizing changes can be made in any client
b. All customizing & dev changes should be made in a single R/3 client
c. Repository object should be created and changed in R/3 Quality assurance client (QAS)
d. Unit testing should take place in the customizing and dev client

12) Which of the following activities should not be performed within a system landscape
a. Customizing & dev changes are promoted to a QAS client before being delivered to PRD
b. The R/3 system is upgraded to a new R/3 release
c. Dev changes are mad directly in the PRD client
d. Changes are assigned to a specific role

13) Which of the following benefits does the 3-system landscape recommended by SAP have?
a. Customizing and dev, testing, and prod activities take place in separate DB environments and do not affect one another
b. Changes are tested in the QAS system and imported in the PRD system only after verification
c. Client independent changes can be made in the DEV system w/o immediately affecting the PRD client
d. All of the above

14) Which of the following statements is correct in regard to multiple R/3 clients?
a. All clients in the same R/3 system share the same R/3 repository and client independent customizing settings
b. No more than one client in the same R/3 system should allow changes to client independent customizing changes.
c. If a client allows for changes to client dependent customizing, the client should also allow for changes to Client independent customizing objects
d. All of the above.

15) Which of the following statements is correct in regard to setup of 3-system landscape
a. There is only R/3 DB for the system landscape
b. One client should allow for the automatic recording of client dependent customizing and client independent changes.
c. All R/3 systems have the same System ID (SID)
d. All clients must have unique client numbers

16) Which of the following statements is correct in regard to the CUST client
a. It should allow changes to client independent customizing, but not repository objects
b. It should automatically record all changes to customizing settings
c. It should not allow changes to client dependent and client independent customizing settings
d. It should allow for all changes, but not require recording of changes to change request.

17) Which of the following statements is correct in regard to the 2-system landscape
a. It is not optimal because 2 is limited opportunity to test the transport of changes from the DEV system to the PRD system
b. It allows for changes to Customizing in the PRD system
c. It is recommended by SAP because Customizing and DEV do not impact QAS testing.
d. All of the above

18) Which of the following statements is correct in regard to Phase implementation.
a. All CUST changes made in PRD support system must also be made in the DEV system
b. The system landscape requires 5 R/3 systems
c. Changes in the PRD support system do not have to be made in the DEV env
d. The system landscape needs an env that supports a PRD system with any reqd changes.

19) Which of the following statements is not valid in regard to global system landscape
a. A global template can be used for the roll out of corporate CUST settings and DEV efforts
b. Management of different repository objects can be managed using name spaces, and name ranges for the repository objects
c. Merging and CUST settings delivered by the corporate office with local CUST efforts can easily be done using change requests
d. SAP provides different tools to aid the roll-out of a global template.

20) Which of the following statements is correct in regard to CUST and DEV changes?
a. all changes are recorded to task in CUST change request
b. the changes should be recorded to tasks in change requests for transport to other clients and systems
c. the changes must be manually performed in every R/3 system
d. the changes can easily be made simultaneously in multiple clients.


21) Which of the following statements in regard to change requests is false?
The customizing organizer and the workbench organizer are tools used to view, create and manager change request
A change request is a collection of tasks where developers and people performing customizing record the changed they make.
All changes made as a result of IMG activities are recorded to customizing change requests.
SAP recommends setting your R/3 system so that customizing changes made in the customizing and development client are automatically recorded to change requests.

22) For which of the following activities is the TMS (tcode STMS) not designed?

Releasing change requests
Viewing import queues
Viewing log files generated by both the export process and the import process
Initiating the import process

23) Which of the following statements is correct after you have successfully imported change request into the quality assurance system?

The change requests must be released again to be exported to the production system.
The data files containing the changed objects are deleted from the transport directory
The change requests need to be manually added to the import queue of the production system
The change requests are automatically added to the import queue of the production system.

24) Which of the following statements is correct in regard to the change requests in an import queue?

They are sequenced according to their change request number.’
They are sequenced in the order in which they were exported from the development system
They are sequenced according to the name of the user who released the requests
They are not sequenced by default, but arranged in a variety of ways using the TMS

25) Which of the following techniques can be used to transfer application data between two PRD systems?
Recording transaction data to change requests
Using ALE to transfer application data
Using the client copy tool
All the above

26) Which of the following types of data transfer are possible within appropriate use of interface technologies?
Transferring legacy data to an R/3 system
Transferring data between R/3 clients
Transferring data to non-SAP systems
Transporting change requests to multiple R/3 systems

27) Which of the following statements is correct in regard to user master data?
User master data can be transported in a change request
User master data is unique to each R/3 system, but is shared across clients in the same R/3 system.
A specific client copy option enables you to distribute user master data together with authorization profile data
User master data included all user logon information, including the definition of authorizations and profiles
28) Which of the following clients should u copy to create new clients and ensure that all data from post installation processing is also copied?
a. Client 000
b. Client 001
c. Client 066

29) Which of the following is not a SAP recommended strategy for setting up a system landscape
a. Using a client copy from the DEV system to set up your QAS and PRD system when the change request strategy is not an option
b. Creating the PRD system as a combination of a client copy from the QAS system and change request from the DEV system
c. Using the same setup strategy to establish both the QAS and PRD systems
d. Setting up the QAS and PRD system by importing Change requests prompted from the DEV system

30) Which of the following are correct in regard to setup of TMS?
a. The TMS should be setup when the DEV system is installed
b. The TMS should include all R/3 systems in the system landscape even if the R/3 systems do not physically exist
c. The TMS is critical in establishing the Transport between the DEV & QAS system
d. The TMS should be setup before the Change request is created in the CUST and DEV client

31) Which of the following is correct in regard to system copy strategy
a. SAP recommends the system copy strategy because all CUST & DEV objects are transferred
b. SAP does not recommend the system copy strategy because there is no easy to eliminate the unwanted APPLCN data
c. A system copy is the easiest set of strategy recommended by SAP
d. A system copy eliminates the need for change requests for the entire R/3 implementation

32) Which of the following activities is not necessary for exporting a change request
a. Documenting every task in the request
b. Releasing every task in the change request
c. Verification of the contents of the change request by the system administrator
d. Unit testing the change request.

33) Which of the following is correct in regard to the task used in the change request that record CUST & DEV changes
a. Task belongs to change request
b. Task can be used by several R/3 users
c. Task are direct responsibility of the Project leader
d. Task records only client specific changes

34) Which of the following indicates that the change request has been signed off after QAS testing.
a. The change request has been released after unit testing.
b. The change request has been successfully imported into the QAS system
c. The change request is added into the import queue of all other R/3 systems in the system landscape
d. The project leader communicates the approval of the change request

35) Which of the following is NOT an SAP recommendation
a. Imports into the QAS & PRD system should occur in the same sequence.
b. Even if the import process is automatically scripted a technical consultant or system admin should revise the result of the import
c. The project leader should manually add a change request to import queue of the QAS system
d. Change request are imported in the same sequence that they were exported from the DEV system

36) Which of the following is SAP’s recommendation on how to rush an emergency correction into the PRD system
a. Make the changes directly in the PRD system
b. Transport the changes from the DEV system to QAS system & PRD system using preliminary import
c. Make the change and use a client copy with change request to distribute the changes into PRD
d. Make the change in the QAS system and transport using preliminary import

37) Which of the following transport activities is not typically the responsibility of the system admin
a. Importing change request into all clients within R/3 system
b. Verifying the success of import process
c. Releasing the change request
d. Assisting in solving either export or import errors

38) Which of the following does SAP provide a customer support?
a. R/3 release upgrade to provide new functionality
b. Support packs to correct identified problems in a specific R/3 release
c. R/3 notes to announce errors & corrections for reported problems
d. All of the above

39) The R/3 system ID (SID)
a. Must be unique for each system sharing the same transport directory
b. Must be unique for each system in the system landscape
c. Can start with a number
d. Can consist of any 3 char combination

40) Which of the following statements is correct in regard to the TRANS dir
a. There can be only one TRANS dir in a system landscape
b. All R/3 systems within Transport group share a common TRANS dir
c. In a system landscape using heterogeneous platforms it is not possible to have a common TRANS dir
d. Only the PRD system can contain the TRANS dir

41) The Transport control program TP
a. Is stored in subdirectory bin of TRANS dir
b. Uses program R3TRANS to access the DB when transporting changes
c. Cannot be used directly on the OS level
d. Depends on the settings of the transport profile

42) The transport profile
Is stored in subdirectory bin of TRANS dir
Contains comments and parameter settings that configure the transport control program TP
Is managed from within TMS as of release 4.5, but is modified with OS text editors in earlier release
Contains only settings that are valid for all R/3 systems in the system landscape


43) The initialization procedure of the CTO

Is especially required after a system copy
Establishes the initial value for change request Ids
Is not mandatory for the purpose of enabling transports
Is performed automatically during R/3 installation by program R3setup

44) Which of the following statements is correct in regard to the settings governing changes to repository objects

Only the customer name range should be modifiable in production systems.
Developments are possible in an R/3 system only if you have applied for a development namespace from SAP
If the global change option is set to not modifiable, it nevertheless possible to make changes in certain name spaces or clients that has their change option set to modifiable.
The global change option should always be set to not modifiable for the quality assurance system and the production system.



45) Which of the following statements is correct in regard to the R/3 systems belonging to a transport domain?
They all share the same transport directory
They are managed centrally using TMS
They belong to the same transport group
They must run on the same operating system and database platform

46) Which of the following statements is correct in regard to the domain controller?
It must be the production system
It occurs once in a transport domain
It occurs in each transport group
It can only be the R/3 system that was originally designated as the transport domain controller
It should never be the production system due to the high system load that the domain controller causes

47) Which of the following statements are correct in regard to the TMS?
It needs to be initialized only on the transport domain controller
It needs to be initialized only on the transport domain controller and the backup domain controller
It must be initialized on every R/3 system
It must be set up before you can set up transport routes

48) Which of the following statements are correct in regard to the RFC destinations for TMS connections?
They are generated automatically when a transport route is created
They are generated between the domain controller and each R/3 system in the transport domain
They must be established manually before you can use the TMS
They are generated during the TMS initialization process
They are only needed for importing change requests

49) How is the actual system landscape, including R/3 system roles and relationships, defined using the TMS?
By including all R/3 system in the transport domain
By configuring transport routes
By assigning a role to each R/3 system during the TMS initialization process
By designating real, virtual, and external R/3 systems

50) Which of the following statements is correct in regard to a consolidation route?
It is defined by an integration system and a consolidation system, and is associated with a transport layer
It is created in the TMS by defining only an integration system and a consolidation system
It is not necessarily required in a two-system landscape
It can be defined only once in a transport group

51) Which of the following statements are correct in regard to client-specific transport routes?
A. They are possible as of R/3 Release 4.0
B. They are possible only as of R/3 Release 4.5, and only if extended transport control is activated
C. They are only allowed for target groups
D. They may not be used in conjunction with client-independent transport routes

52) After you create a new client entry in table T000, which of the following activities enables you to provide the client with data?
A remote client copy to populate the client with data from a client in another R/3 system
A client transport to import data from a client in another R/3 system
A local client copy to import data from a client within the same R/3 system
All of the above

53) Which of the following cannot be used to restrict a client from certain activities?
The client role
The client-dependent change option
The client ID-number
A client restriction
The client-independent change option

54) Which of the following tasks can be performed using the client copy tools?
Merging application data from one client into another client
Copying only application data from one client to another client
Copying only Customizing data from one client to another client
All of the above

55) Which of the following tasks can be performed using the client copy profiles?
Scheduling a client copy to occur at a time when system use is low
Selecting the subset of application data that will be copied when a client copy is executed
Providing required user authorization for the use of client tools
Determining the data that will be copied when a client copy is executed

56) Which of the following statements is correct in regard to table logging?
Table logging should be used instead of change requests whenever possible
Table logging provides an audit history of who made what changes and when
Table logging does not negatively impact system resources
All of the above

57) Which of the following statements is false in regard to development classes?
A. Development classes facilitate project management by grouping similar Repository objects
B. All Repository objects are assigned to a development class
C. A development class determines the transport route that a changed Repository object will follow
D. A local object does not need a development class

58) Which of the following kinds of changes are transported using Workbench change requests?
Client-independent changes
Modifications to SAP-delivered objects
Changes made using the ABAP Editor and ABAP Dictionary
Repairs to R/3 Repository objects that originated in another R/3 System
All of the above

59) Which of the following data is not contained in the object list of a task?
A. The actual change made to the objects listed in the task
B. The list of changed objects recorded to the task
C. Whether the objects recorded to the task are locked
D. The complete Object Directory entry for the object

60) Which of the following statements are correct regarding repairs and modifications?
Repairs are changes to SAP-delivered objects; modifications are changes to any object that originated on an R/3 System other than the current R/3 System
A repair flag protects an R/3 Repository object against being overwritten by an import
All repairs are saved to Workbench change requests
A modification is a change to an SAP-delivered object
All of the above

61) Which of the following requirements must be met before you can change both client-dependent and client-independent Customizing settings in a client?
A. The client settings must allow for changes to client-independent Customizing objects
B. The client role must be Production
C. The system change option must be set to Modifiable
D. The client settings must allow for changes to client-dependent Customizing

62) Which of the following statements are correct when project leaders and project team members receive only the recommended authorizations?
A. Only developers can create change requests
B. Only project leaders can create change requests, and are therefore responsible for assigning project team members to change requests
C. Project team members can create and release change requests
D. Project leaders can release change requests

63) Which of the following statements are correct with regard to Project IMGs?
A. The Project IMG provides access to the Customizing activities defined for a particular project
B. Customizing is performed in the project IMG tree structure
C. The Project IMG enables you to display project status information and document Customizing activities
D. All of the above

64) Which of the following activities are performed using the Customizing Organizer?
A. Viewing all Customizing change requests related to a particular user
B. Viewing all Workbench change requests related to a particular user
C. Viewing all change requests related to a particular user
D. Managing change requests you own or reviewing change requests in which you have assigned tasks

65) Which of the following statements is correct in regard to Customizing?
A. All Customizing activities in the IMG activities can be transported
B. All changes resulting from IMG activities can be transported
C. All Customizing changes are automatically recorded to a change request if the client change option is set to Automatic recording of changes
D. A Customizing activity may involve the creation of client-independent objects and therefore requires Workbench change request

66) Which of the following activities are performed using client comparison tools?
A. Comparing the customizing settings of two R/3 clients in the same R/3 System or in a different R/3 System
B. Adjusting the Customizing differences between two different R/3 clients
C. Transporting Customizing settings into the production client
D. Comparing the objects listed in the object list of a change request with an R/3 client

67) Which of the following is a prerequisite for copying client-dependent changes to a unit test client using a client copy according to a transport request (Transaction SCC1)?
A. The change request has been released
B. The tasks have been released, but the change request has not
C. The tasks have been released after successful unit testing by the owner of the task
D. The change request has not been released

68) Which of the following are the results of releasing a task?
A. A data file is created in the transport directory and contains the objects recorded in the change request
B. The object list and documentation for the task are copied to the change request
C. All objects recorded in the task are locked
D. You can no longer save changes to that task

69) Which of the following are result of releasing and exporting a change request?
A. A data file is created in the transport directory to contain copies of the objects recorded in the change request
B. Versions are created in the version database for all R/3 Repository objects in the object list of the change request
C. All repairs recorded in the change request are confirmed
D. You can no longer save changes to that change request

70) When you release a Customizing change request, you have the option to do which of the following?
A. Release the change request to another Customizing change request
B. Schedule the release of the change request for a late time
C. Release the change request to a transportable change request
D. Initiate immediate release and export

71) Which of the following is a prerequisite for releasing a transportable change request?
A. There are no syntax errors in the ABAP programs recorded to the change request
B. You must own the tasks in the change request
C. All Repository objects in the change request are locked by the change request
D. The change request has documentation

72) The export process initiates which of the following activities?
A. The creation of files in the transport directory
B. The automatic import of change requests into the target system—for example, the quality assurance system
C. The addition of the exported change request to the import buffer of the target system
D. The deletion of the change request within the R/3 System

73) Which of the following activities result in a version history for all Repository objects?
A. A Repository object is recorded to a change request
B. Change requests are imported into an R/3 System, and the transport parameter vers_at_imp is activated
C. A task containing a Repository object is released
D. A change request containing a Repository object is released

74) Which of the following statements are correct in regard to import queues?
A. Import queues are the TMS representation of the import buffer on the operating system level
B. You have to manipulate import queues to transport change requests
C. Import queues should be closed before starting an import using TMS
D. You can import only an entire import queue

75) Which of the following statements is correct in regard to preliminary imports?
A. SAP recommends using preliminary imports rather than imports of entire queues.
B. Preliminary imports should be performed only in exceptional cases
C. Change requests imported as preliminary imports remain in the import queue
D. Change requests are deleted from the import queue after preliminary imports. This prevents them from being imported gain with the next import of the entire import queue

76) Which of the following statements is correct in regard to imports into an R/3 System?
A. Imports can be performed only by using the start import functionality in the TMS
B. Imports can be performed only by using tp commands on the operating system level to prepare the import queue and then using the start import functionality in the TMS
C. Imports can be performed only by using tp commands at the operating system level
D. Imports can be performed by using either a tp command on the operating system level or the TMS import functionality

77) Which of the following statements is correct in regard to transports between different transport groups?
A. They are not possible
B. They can be performed only by using tp on the operating system level with special options
C. They can be performed using the TMS with special options provided by the expert mode
D. They require you to adjust the corresponding import queues

78) Which of the following statements are correct in regard to transports between different transport domains?
A. They are not possible
B. They require you to create a virtual system and a virtual transport directory
C. They require you to configure identical transport groups within the different transport domains
D. They require you to create external systems and an external transport directory
E. They require you to adjust the corresponding import queues.

79) Which of the following statements re correct in regard to the transport control program tp?
A. To perform imports, tp must always be used directly on the operating system level
B. SAP recommends that you use the TMS instead of tp to perform imports
C. tp is responsible for exporting and importing objects from and to R/3 Systems
D. tp does not observe the sequence of change requests in the import queue when performing imports

80) Which of the following statements are correct in regard to import queues and import buffers?
A. Import queues are TMS representations in R/3 of the import buffer files on the operating system level
B. Import queues and import buffers are completely independent of each other
C. Import buffers have to be manipulated before imports can be performed on the operating system level
D. Manipulating import buffers may cause serious inconsistencies and should be performed only in exceptional cases.

81) Which of the following statements are correct in regard to the import options formerly known as unconditional modes?
A. Import options cannot be used when imports are performed on the operating system level using tp.
B. Import options are used to cause specific rules of the Change and Transport System (CTS) to be ignored
C. Import options must be used when importing into multiple clients using tp.
D. Import options can be selected in the TMS using the expert mode

82) Which of the following statements are correct in regard to the sequence of processing steps tp follows when performing imports?
A. tp collectively processes each import step for all change requests in an import queue before proceeding with the next import step
B. tp processes all import steps for a single request before proceeding to the next change request
C. The processing sequence followed by tp ensures that when a change request with a faulty object is followed in the import queue by a change request with the corrected object, the faulty object will not affect the runtime environment of the target system
D. tp imports and activates ABAP Dictionary structures prior to the main import phase to ensure that the current structures are able to receive new data during the main import phase.

83) Which of the following statements are correct in regard to troubleshooting imports?
A. In R/3, you cannot display log files that do not depend on a specific request. For example, you cannot display log files related to generic import steps, such as structure conversion.
B. SAP recommends that you check the SLOG file and the ALOG file before checking the single step log files.
C. By default, all return codes greater than eight cause tp to abort a running import
D. tp is the only transport tool that uses return codes.

84) Which of the following statements are correct in regard to buffer synchronization?
A. Transport activities do not affect buffer synchronization
B. Imports affect buffer synchronization even in central R/3 systems
C. R3trans can invalidate buffer content
D. Importing data into a production system can significantly impact performance, because some buffer content may be invalidated and reloaded. This causes high system load
E. Importing programs and ABAP Dictionary data cannot cause inconsistencies in the target system, even if the programs or data affect running programs and their environment

85) Which of the following statements are correct in regard to the interaction between transport tools?
A. During exports, tp calls R3trans to access the database of the source system and extract the objects to be transported
B. tp triggers the transport daemon RDDIMPDP in R/3 using the operating system tool sapevt
C. Using the tables TRBAT and TRJOB, tp communicates with ABAP programs involved in the transport process
D. tp communicates with only RDDIMPDP

86) Which of the following statements are correct in regard to the R/3 Release strategy?
A. Functional Releases are automatically shipped to all customers
B. Correction Releases provide only corrections and no new functionality with respect to the previous R/3 Functional Release
C. Functional Releases receive only limited OCS maintenance; that is, only very urgent corrections are available as Support Packages
D. R/3 Release upgrades are possible only for Correction Releases

87) Which of the following statements are correct in regard to Support Packages?
A. Support Packages change the SAP standard of your R/3 System in advance of the next R/3 Release upgrade
B. You can apply all types of Support Packages to all R/3 installations, regardless of the components used in the installation
C. Support Packages are available only to customers who are participants in the First Customer Shipment (FCS) program
D. Different types of Support Packages may be required for R/3 Installations with different components

88) Which of the following statements are correct in regard to the SAP Patch Manager?
A. The SAP Patch Manager ensures that Support Packages are applied in the correct sequence
B. The SAP Patch Manager does not check whether the type of Support Package you wish to apply is appropriate for your R/3 installation. It is up to you to decide whether, for example, you require a Conflict Resolution Transport.
C. The SAP Patch Manager does not offer you the chance to protect SAP objects that you have modified. These objects are automatically overwritten.
D. The SAP Patch Manager automatically prompts you to call the modification adjustment Transactions SPDD or SPAU if necessary

89) Which of the following statements are correct in regard to R/3 Release upgrades?
A. Objects in the customer namespace are not overwritten
B. A Repository switch is the replacement of your current R/3 Repository by the R/3 Repository in the new R/3 Release
C. All customer modifications to ABAP Dictionary object are lost
D. Customer modifications to SAP objects that you want to preserve must be transferred to the new Release through the modification adjustment process

90) Which of the following statements are correct in regard to the modification adjustment process?
A. Transaction SPAU is used for most ABAP Dictionary objects
B. Transaction SPDD is used for most ABAP Dictionary objects
C. Not using Transaction SPDD where applicable may cause data loss
D. During modification adjustment, you must choose to return to the SAP standard



Answers:

1. D
2. B
3. B
4. B
5 A, D
6 D
7. B, D
8. D
9 A
10. D
11. B
12. C
13. D
14. D
15. B
16. B
17. A
18. A, D
19. C
20. B
21 C
22. A
23 D
24 B
25 B
26 A, B, C
27 C
28 B
29 B
30 A, B, C, D
31 B
32 C
33 A
34 D
35 C
36 B
37 C
38 D
39 A, B
40 B
41 B, D
42 A, B, C
43 A, B
44 D
45 B
46 B
47 C, D
48 B, D
49 B
50 A
51 B, D
52 D
53 C
54 C
55 D
56 B
57 D
58 E
59 A, D
60 B, C, D
61 A, C, D
62 B, D
63 D
64 A, B, C, D
65 D
66 A, B, D
67 D
68 B, D
69 A, B, D
70 C, D
71 C
72 A, C
73 B, D
74 A, C
75 B, C
76 D
77 D
78 D, E
79 B, C
80 A, D
81 B, C, D
82 A, C, D
83 A, B, C
84 B, C, D
85 A, B, C
86 B, C
87 A, D
88 A, D
89 A, B, D
90 B, C

SAP BDC

1. What is full form of BDC Session?
Batch Data Communication Session.

2. What are the steps in a BDC session?
The first step in a BDC session is to identify the screens of the transaction that the program will process. Next step is to write a program to build the BDC table that will be used to submit the data to SAP. The final step is to submit the BDC table to the system in the batch mode or as a single transaction by the CALL TRANSACTION command.

3. How do you find the information on the current screen?
The information on the current screen can be found by SYSTEM à STATUS command from any menu.

4. How do you save data in BDC tables?
The data in BDC tables is saved by using the field name ‘BDC_OKCODE’ and field value of ‘/11’.

5. What is the last entry in all BDC tables?
In all BDC tables the last entry is to save the data by using the field name BDC_OKCODE and a field value of ‘/11’.

6. What is a multiple line field?
A multiple line field is a special kind of field which allows the user to enter multiple lines of data into it.

7. How do you populate data into a multiple line field?
To populate data into a multiple line field, an index is added to the field name to indicate which line is to be populated by the BDC session (Line index).

8. Write the BDC table structure.
BDC table structure

FIELD TYPE DESCRIPTION
Program CHAR (8) Program name of transaction.
DynPro CHAR (4) Screen number of transaction.
DynBegin CHAR (1) Indicator for new screen.
Fnam CHAR (35) Name of database field from screen.
Fval CHAR (80) Value to submit to field.

9. Does the CALL TRANSACTION method allow multiple transactions to be processed by SAP?
No. The CALL TRANSACTION method allows only a single transaction to be processed by SAP.
10. Does the BDC-INSERT function allow multiple transactions to be processed by SAP?
Yes.
11. What is the syntax for ‘CALL TRANSACTION’?
CALL TRANSACTION trans [ using bdctab MODE mode ].
Three possible entries are there for MODE.
A - Show all screens.
E - Show only screens with errors.
N - Show no screens.

SAP Transactions



What is a transaction?
- A transaction is dialog program that change data objects in a consistant way.

What are the requirements a dialog program must fulfill?
A dialog program must fulfil the following requirements
- a user friendly user interface.
- Format and consistancey checks for the data entered by the user.
- Easy correction of input errors.
- Access to data by storing it in the data bases.

3.What are the basic components of dialog program?
- Screens (Dynpros)
- Each dialog in an SAP system is controlled by dynpros.A dynpros consists of a screen
And its flow logic and controls exactly one dialog step.
- ABAP/4 module Pool.
Each dynpro refers to exactly one ABAP/4 dialog program .Such a dialog program is also called a module pool ,since it consists of interactive modules.

4.What is PBO and PAI events?
PBO- Process Before Output-It determines the flow logic before displaying the screen.
PAI-Process After Input-It determines the flowlogic after the display of the screen and after receiving inputs from the User.

5. What is dynpro?What are its components ?
- A dynpro (Dynamic Program) consists of a screen and its flow logic and controls exactly one dialog steps.
- The different components of the dynpro are :
Flow Logic: calls of the ABAP/4 modules for a screen .
Screen layout:Positions of the text ,fields,pushbuttons and so on for a screen
Screen Attributes:Number of the screen,number of the subsequent screen,and others
Fields attributes :Definition of the attributes of the individual fields on a screen.

6. What is a ABAP/4 module pool?
-Each dynpro refers to exactly one ABAP/4 dialog program.Such a dialog program is also called
a module pool ,since it consists on interactive modules.

7..Can we use WRITE statements in screen fields?if not how is data transferred from field data to screen fields?
-We cannot write field data to the screen using the WRITE statement.The system instead transfers data by comparing screen fields names with ABAP/4 variable names.If both names are the same,it
transfers screen fields values to ABAP/4 programs fields and Vice Versa.This happens immediately after displaying the screen.

8.Can we use flow logic control key words in ABAP/4 and vice-versa?
- The flow control of a dynpro consists os a few statements that syntactically ressemble ABAP/4 statements .However ,We cannot use flow control keywords in ABAP/4 and vice-versa.

9.What is GUI status? How to create /Edit GUI status?
-A GUI status is a subset of the interface elements used for a certain screen.The status comprises
those elements that are currently needed by the transaction .The GUI status for a transaction may be composed of the following elements:
-Title bar.
-Mneu bar.
-Application tool bar
-Push buttons.

To create and edit GUI status and GUI title,we use the Menu Painter.

10. How does the interection between the Dynpro and the ABAP/4 Modules takes place?
-A transaction is a collection os screens and ABAP/4 routines ,controlled and executed by a Dialog processor.The Dilaog processor processes screen after the screen ,thereby triggering the appropriate
ABAP/4 processing of each screen .For each screen,the system executes the flow logic that contains the corresponding ABAP/4 processing.The controls passes from screen flow logic to ABAP/4 code and back.

11. How does the Dialog handle user requests?
- when an action is performed ,the system triggers the PROCESS AFTER INPUT event.The data passed includes field screen data data entered by the user and a function code. A functioncode is a technical name that has been allocated in a screen Painter or Menu Painter to a meny entry,a push button,the ENTER key or a function Key of a screen.An internal work field(ok-code)in the PAI module evaluates the function code,and the appropriate action is taken.


What is to be defined for a push button fields in the screen attributes?
- A function code has to be defined in the screen attributes for the push buttons in a screen.

How are the function code handles in Flow Logic?
- When the User selects a function in a transaction ,the system copies the function code into a specially designated work field called OK_CODE.This field is Global in ABAP/4 Module Pool.The OK_CODE can then be evaluated in the corresponding PAI module. The function code is always passed in Exactly the same way , regardless of Whether it comes from a screen’s pushbutton,a menu
option ,function key or other GUI element.

14.What controls the screen flow?
- The SET SCREEN and LEAVE SCREEN statements controls screen flow.



The Function code currently active is ascertained by what Variable?
- The function code currently active in a Program can be ascertained from the SY-UCOMM Variable.

The function code currently active is ascertained by what variable ?
- By SY-UCOMM Variable.


What are the “field” and “chain” Statements?
- The FIELD and CHAIN flow logic statements let you Program Your own checks.FIELD and CHAIN tell the system Which fields you are checking and Whether the System should Perform Checks in the flow logic or call an ABAP/4 Module.

What is an “on input filed” statements?
- ON INPUT
The ABAP/4 module is called only if a field contains the Value other than the initial Value.This initial Value is determined by the filed’s Dta Type: blanks for character Fields
,Zeroes for numerics. If the user changes the Fields Value back t o its initial value,ON INPUT does not trigger a call.


What is an “on request Field” statement?
- ON REQUEST
The ABAP/4 Module is called only if the user has entered the value in the field value since the last screen display .The Value counts as changed Even if the User simply types in the value that was already there .In general ,the ON REQUEST condition is triggered through any
Form of” MANUAL INPUT’.

What is an on”*-input filed” statement?
ON *-INPUT
- The ABAP/4 module is called if the user has entered the “*” in the first character of the field, and the field has the attribute *-entry in the screen Painter.You can use this option in Exceptionla cases where you want to check only fields with certain Kinds of Input.


What are conditional chain statement?
ON CHAIN-INPUT similar to ON INPUT.
The ABAP/4 module is called if any one of the fields in the chain contains a value other than its initial value(blank or nulls).
ON CHAIN-REQUEST
This condition functions just like ON REQUEST, but the ABAP/4 module is called if any one of the fields in the chain changes value.

What is “at exit-command:?
The flowlogic Keyword at EXIT-COMMAND is a special addition to the MODULE statement in the Flow Logic .AT EXIT-COMMAND lets you call a module before the system executes the automatic fields checks.

Which Function type has to be used for using “at exit-command” ?
- To Use AT EXIT – COMMAND ,We must assign a function Type “E” to the relevant function in the MENU Painter OR Screen Painter .

What are the different message types available in the ABAP/4 ?
- There are 5 types of message types available.
- E: ERROR
- W-WARNING
- I –INFORMATION
- A-ABNORMAL TERMINATION.
- S-SUCCESS

Of the two “ next screen “ attributes the attributes that has more priority is -------------------.
Dynamic.


Navigation to a subsequent screen can be specified statically/dynamically .(TRUE/FALSE).
TRUE.


Dynamic screen sequence for a screen can be set using ------------- and ----------------- commands

Set Screen, Call screen.

27. The commands through Which an ABAP/4 Module can “branch to “ or “call” the next screen are

1.------------,2--------------,3---------------,4------------.

- Set screen,Call screen ,Leave screen, Leave to screen .


28. What is difference between SET SCREEN and CALL SCREEN ?

- With SET SCREEN the current screen simply specifies the next screen in the chain , control branches to this next screen as sonn as th e current screen has been processed .Return from next screen to current screen is not automatic .It does not interrupt processing of the current screen.If we want to branch to the next screen without finishing the current one ,use LEAVE SCREEN.

- With CALL SCREEN , the current (calling) chain is suspended , and a next screen (screen chain) is called .The called can then return to the suspended chain with the statement LEAVE SCREEN TO SCREEN 0 .Sometime we might want to let an user call a pop up screen from the main application screen to let him enter secondary information.After they have completed their enteries, the users should be able to close the popup and return directly to the place where they left off in the main screen.Here comes CALL SCREEN into picture .This statement lets us insert such a sequence intp the current one.

29. Can we specify the next screen number with a variable (*Yes/No)?

- Yes

30. The field SY-DYNR refers to--------------

Number of the current screen.

31. What is dialog Module?
- A dialog Module is a callable sequence of screens that does not belong to a particular transaction.Dialog modules have their module pools , and can be called by any transaction.

32. The Syntex used to call a screen as dialog box (pop up)is---------

CALL SCREEN
STARTING AT
ENDING AT

33. What is “call mode”?
- In the ABAP/4 WORLD each stackable sequence of screens is a “call mode”, This is IMP because of the way u return from the given sequence .To terminate a call mode and return to a suspended chain set the “next screen” to 0 and leave to it:
LEAVE TO SCREEN 0 or (SET SCREEN 0 and LEAVE SCREEN) .When u return to the suspended chain execution resumes with the statement directly following the original CALL SCREEN statement.The original sequence of screens in a transaction (that is , without having stacked any additional call modes),you returned from the transaction altogether.


34. The max number of calling modes stacked at one time is?
- NINE

35. What is LUW or Data base Transaction ?

- A “LUW”(logical unit of work) is the span of time during which any database updates must be performed in an “all or nothing” manner .Either they are all performed (committed),or they are all thrown away (rolled back).In the ABAP/4 world , LUWs and
- Transactions can have several meanings:

LUW (or “database LUW” or “database transaction”)

This is the set of updates terminated by a database commit. A LUW lasts ,at most , from one screen change to the next (because the SAP system triggers database commits automatically at every screen change).

36. What is SAP LUW or Update Transaction?
Update transaction (or “SAP LUW”)
This is a set of updates terminated by an ABAP/4 commit. A SAP LUW may last much longer than a database LUW, since most update processing extends over multiple transaction screens. The programmer terminates an update transaction by issuing a COMMIT WORK statement.

37. What happens if only one of the commands SET SCREEN and LEAVE SCREEN is used without using the other?
If we use SET SCREEN without LEAVE SCREEN, the program finishes processing for the current screen before branching to . If we use LEAVE SCREEN without a SET SCREEN before it, the current screen process will be terminated and branch directly to the screen specified as the default next-screen in the screen attributes.

38. What is the significance of the screen number ‘0’?
In “calling mode”, the special screen number 0 (LEAVE TO SCREEN 0) causes the system to jump back to the previous call level. That is, if you have called a screen sequence with CALL SCREEN leaving to screen 0 terminates the sequence and returns to the calling screen. If you have not called a screen sequence, LEAVE TO SCREEN 0 terminates the transaction.

39. What does the ‘SUPPRESS DIALOG’ do?
Suppressing of entire screens is possible with this command. This command allows us to perform screen processing “in the background”. Suppresing screens is useful when we are branching to list-mode from a transaction dialog step.

40. What is the significance of the memory table ‘SCREEN’?
At runtime, attributes for each screen field are stored in the memory table called ‘SCREEN’. We need not declare this table in our program. The system maintains the table for us internally and updates it with every screen change.

41. What are the fields in the memory table ‘SCREEN’?
Name Length Description

NAME 30 Name of the screen field
GROUP1 3 Field belongs to field group 1
GROUP2 3 Field belongs to field group 2
GROUP3 3 Field belongs to field group 3
GROUP4 3 Field belongs to field group4
ACTIVE 1 Field is visible and ready for input.
REQUIRED 1 Field input is mandatory.
INPUT 1 Field is ready for input.
OUTPUT 1 Field is display only.
INTENSIFIED 1 Field is highlighted
INVISIBLE 1 Field is suppressed.
LENGTH 1 Field output length is reduced.
DISPLAY_3D 1 Field is displayed with 3D frames.
VALUE_HELP 1 Field is displayed with value help.

42. Why grouping of fields is required? What is the max no of modification groups for each field?
If the same attribute need to be changed for several fields at the same time these fields can be grouped together. We can specify up to four modification groups for each field.

43. What are the attributes of a field that can be activated or deactivated during runtime?
Input, Output, Mandatory, Active, Highlighted, Invisible.

44. What is a screen group? How it is useful?
Screen group is a field in the Screen Attributes of a screen. Here we can define a string of up to four characters which is available at the screen runtime in the SY-DNGR field. Rather than maintaining field selection separately for each screen of a program, we can combine logically associated screens together in a screen group.

45. What is a Subscreen? How can we use a Subscreen?
A subscreen is an independent screen that is displayed in a n area of another (“main”) screen. To use a subscreen we must call it in the flow logic (both PBO and PAI) of the main screen. The CALL SUBSCREEN stratement tells the system to execute the PBO and PAI events for the subscreen as part of the PBO or PAI events of the main screen. The flow logic of your main program should look as follows:
PROCESS BEFORE OUTPUT.
CALL SUBSCREEN INCLUDING ‘’ ’’.
PROCESS AFTER INPUT.
CALL SUBSCREEN .
Area is the name of the subscreen area you defined in your main screen. This name can have up to ten characters. Program is the name of the program to which the subscreen belongs and screen is the subscreen’s number.

46. What are the restrictions on Subscreens?
Subscreens have several restrictions. They cannot:
· Set their own GUI status
· Have a named OK code
· Call another screen
· Contain an AT EXIT-COMMAND module
· Support positioning of the cursor.

47. How can we use / display table in a screen?
ABAP/4 offers two mechanisms for displaying and using table data in a screen. These mechanisms are TABLE CONTROLS and STEP LOOPS.

48. What are the differences between TABLE CONTROLS and STEP LOOPS?
TABLE CONTROLS are simply enhanced STEP LOOPS that display with the look and feel of a table widget in a desktop application. But from a programming standpoint, TABLE CONTROLS and STEP LOOPS are almost exactly the same. One major difference between STEP LOOPS and TABLE CONTROLS is in STEP LOOPS their table rows can span more than one time on the screen. By contrast the rows in a TABLE CONTROLS are always single lines, but can be very long. (Table control rows are scrollable). The structure of table control is different from step loops. A step loop, as a screen object, is simply a series of field rows that appear as a repeating block. A table control, as a screen object consists of: I) table fields (displayed in the screen ) ii) a control structure that governs the table display and what the user can do with it.

49. What are the dynapro keywords?
FIELD, MODULE, SELECT, VALUES and CHAIN are the dynapro keywords.

50. Why do we need to code a LOOP statement in both the PBO and PAI events for each table in the screen?
We need to code a LOOP statement in both PBO and PAI events for each table in the screen. This is because the LOOP statement causes the screen fields to be copied back and forth between the ABAP/4 program and the screen field. For this reason, at least an empty LOOP….ENDLOOP must be there.

51. The field SY-STEPL refers to the index of the screen table row that is currently being processed. The system variable SY-stepl only has a meaning within the confines of LOOP….ENDLOOP processing. Outside the loop, it has no valid value.

52. How can we declare a table control in the ABAP/4 program?

Using the syntax controls < table > type tableview using screen < scr >.

53. Differentiate between static and dynamic step loops.
Step loops fall into two classes: Static and Dynamic. Static step loops have a fixed size that cannot be changed at runtime. Dynamic step loops are variable in size. If the user re-sizes the window the system automatically increases or decreases the number of step loop blocks displayed. In any given screen you can define any number of static step loops but only a single dynamic one.

54. What are the two ways of producing a list within a transaction?
By submitting a separate report.
By using leave to list-processing.

55. What is the use of the statement Leave to List-processing?
Leave to List-processing statement is used to produce a list from a module pool. Leave to list processing statement allows to switch from dialog-mode to list-mode within a dialog program.

56. When will the current screen processing terminates?
A current screen processing terminates when control reaches either a Leave-screen or the end of PAI.

57. How is the command Suppress-Dialog useful?
Suppressing entire screens is possible using this command. This command allows us to perform screen processing “in the background”. The system carries out all PBO and PAI logic, but does not display the screen to the user. Suppressing screens is useful when we are branching to list-mode from a transaction dialog step.

58. What happens if we use Leave to list-processing without using Suppress-Dialog?
If we don’t use Suppress-Dialog to next screen will be displayed but as empty, when the user presses ENTER, the standard list output is displayed.

59. How the transaction that are programmed by the user can be protected?
By implementing an authority check.

60. What are the modes in which any update tasks work?
Synchronous and Asynchronous.

61. What is the difference between Synchronous and Asynchronous updates?
A program asks the system to perform a certain task, and then either waits or doesn’t wait for the task to finish. In synchronous processing, the program waits: control returns to the program only when the task has been completed. In asynchronous processing, the program does not wait: the system returns control after merely logging the request for execution.

62. SAP system configuration incluedes Dialog tasks and Update tasks.
63. Dialog-task updates are Synchronous updates.
64. Update –task updates are Asynchronous updates.
65. What is the difference between Commit-work and Rollback-Work tasks?
Commit-Work statement “performs” many functions relevant to synchronized execution of tasks. Rollback-work statement “cancels: all reuests relevant to synchronized execution of tasks.

66. What are the different database integrities?
· Semantic Integrity.
· Relational Integrity.
· Primary Key Integrity.
· Value Set Integrity.
· Foreign Key integrity and
· Operational integrity.

67. All SAP Databases are Relational Databases.
68. What is SAP locking?
It is a mechanism for defining and applying logical locks to database objects.

69. What does a lock object involve?
The tables.
The lock argument.

70. What are the different kinds of lock modes?
Shared lock
Exclusive lock.
Extended exclusive list.

71. How can a lock object be called in the transaction?
By calling Enqueue and Dequeue in the transaction.

72. What are the events by which we can program “help texts” and display “possible value lists”?
-PROCESS ON HELP-REQUEST (POH).
-PROCESS ON VALUE-REQUEST (POV).

73. What is a matchcode?
A matchcode is an aid to finding records stored in the system whenever an object key is required in an input field but the user only knows other (non-key) information about the object.

74. In what ways we can get the context sensitive F1 help on a field?
- Data element documentation.
- Data element additional text in screen painter.
- Using the process on help request event.

75. What is roll area?
A roll area contains the program’s runtime context. In addition to the runtime stack and other structures, all local variables and any data known to the program are stored here.

76. How does the system handle roll areas for external program components?
- Transactions run in their own roll areas.
- Reports run in their own roll areas.
- Dialog modules run in their own roll areas
- Function modules run in the roll area of their callers.

77. Does the external program run in the same SAP LUW as the caller, or in a separate one?
- Transactions run with a separate SAP LUW
- Reports run with a separate SAP LUW.
- Dialog modules run in the same SAP LUW as the caller
- Function modules run in the same SAP LUW as the caller.
The only exceptions to the above rules are function modules called with IN UPDATE TASK (V2 function only) or IN BACKGROUND TASK (ALE applications). These always run in their own (separate) update transactions.

78. What are function modules?
Function modules are general-purpose library routines that are available system-wide.

79. What are the types of parameters in the function modules?
In general, function module can have four types of parameters:
- EXPORTING: for passing data to the called function.
- IMPORTING: for receiving data returned from the function module.
- TABLES: for passing internal tables only, by reference (that is, by address).
- CHANGING: for passing parameters to and from the function.

80. What is the difference between Leave Transaction and Call Transaction?
In contrast to LEAVE TO TRANSACTION, the CALL TRANSACTION statement causes the system to start a new SAP LUW. This second SAP LUW runs parallel to the SAP LUW for the calling transaction.

81. How can we pass selection and parameter data to a report?
There are three options for passing selection and parameter data to the report.
- Using SUBMIT…WITH
- Using a report variant.
- Using a range table.

82. How to send a report to the printer instead of displaying it on the screen?
We can send a report to the printer instead of diplaying it on the screen. To do this, use the keywords TO SAP-SPOOL:
SUBMIT RSFLFIND…TO SAP-SPOOL DESTINATION ‘LT50’.

83. How can we send data to external programs?
Using SPA/GPA parameters(SAP memory).
Using EXPORT/IMPORT data (ABAP/4 memory)

84. What are SPA/GPA parameters (SAP memory)
SPA/GPA parameters are field values saved globally in memory. There are two ways to use SPA/GPA parmeters:
By setting field attributes in the Screen Painter.
By using the SET PARAMETER or GET PARAMETER statements.